Lawson Street - water supply submain renewals

What

We will be carrying out water supply submain renewals.

Why

Existing water supply pipes are nearing the end of their service life and require replacement.

Where

Lawson Street, Sydenham.

When

24 August 2026 to mid-September 2026. Monday to Friday, 7am to 6pm. Fine weather is needed for specific roading and construction tasks meaning dates may vary.

Contact

The contractor is Trenching Dynamix. The site manager can be contacted on 027 208 4139, Monday to Friday, 7am to 6pm. Please talk to the contractor about any specific access requirements as soon as possible.

Details

  • There may be times when vehicle access to properties is temporarily restricted. The contractor will door-knock beforehand to allow residents to move vehicles if necessary.
  • Traffic impacts can be expected, such as road closure, shoulder closures, temporary traffic lights and footpath closures while these works are being undertaken.
  • The work may result in increased dust, noise and vibrations.
  • We will try to keep any disruption to a minimum.
  • Water supply to your property will be maintained, with a separate notice being given for the shut-off when connecting to the new pipes.