What |
We will be carrying out water supply submain renewals. |
|---|---|
Why |
Existing water supply pipes are nearing the end of their service life and require replacement. |
Where |
Bucknell Street, Sockburn. |
When |
7 September 2026 to 2 October 2026. Monday to Friday, 7am to 6pm (weather/site condition dependent). |
Contact |
The contractor is CORDE Ltd. Phone 03 318 8320 (press 6), Monday to Friday, 7am to 5pm or email: construction@corde.nz. |
Details
- Traffic management will be in place with footpath and shoulder closures, and temporary traffic lights will be required for 2 days. These will be clearly sign posted. No parking will be established along Bucknell Street where required for works to be completed.
- There may be times when vehicle access to properties is temporarily restricted. The contractor will door knock beforehand to allow residents to move vehicles if necessary. Please talk to the contractor about any specific access requirements as soon as possible before works commence.
- The works may result in increased dust, noise and vibrations.
- We will try to keep any disruption to a minimum, and we apologise in advance for any inconvenience.
- Water supply to your property will be maintained, with a separate notice being given for the shut-off when connecting to the new pipes.
Thank you for your understanding and co-operation during the works.