What |
We are replacing a section of watermain and associated service connections as part of the Christchurch City Council's annual water infrastructure renewal programme. |
|---|---|
Why |
Existing watermain and sub-main pipes are reaching the end of their service life and require replacing. |
Where |
Public walkway located between Cannon Hill Crescent and Te Awakura Terrace, Mt Pleasant. |
When |
31 August 2026 to mid September 2026. Monday to Friday, 7am to 5pm (weather/site condition dependent). |
Contact |
The contractor is Utilities Infrastructure NZ Ltd. Phone Kieran Rogers on 027 547 6202, Monday to Friday, 9am to 5pm. |
Details
The walkway will be closed to public access between 7am and 5pm daily for the duration of the project.
There may be times when vehicle access to properties is temporarily restricted. The contractor will door knock beforehand to allow residents to move vehicles if necessary.
The works may result in increased dust, noise and vibrations. We will try to keep any disruption to a minimum, and we apologise in advance for any inconvenience.
Water supply to your property will be maintained, with a separate notice being given for the shut-off when connecting to the new pipes.
Thank you for your understanding and cooperation during the works.