What |
We are relocating power infrastructure, installing new services and removing old end of life equipment. |
|---|---|
Why |
This work is needed to enable flood mitigation and ecological restoration in the red zone, as part of the wider Ōtākaro Avon River corridor regeneration programme. |
Where |
Anzac Drive, Wainoni Road, Pages Road and New Brighton Road, Bexley. |
When |
14 September 2026 to 18 December 2026. Monday to Friday, 7am to 6pm (weather/site condition dependent). |
Contact |
The contractor is CORDE. Phone 03 318 8320 (press 6 for construction), Monday to Friday, 8am to 5pm or email construction@corde.nz. |
Details
We're carrying out works to relocate power services along Anzac Drive as part of the wider red zone regeneration programme.
This involves:
- Relocating existing power services along Anzac Drive.
- Removing old end of life power infrastructure.
- Hydro and air excavation to safely expose and work around underground services.
- Reinstating the footpath, berm, and road shoulder on completion.
Traffic Impacts
- A shoulder closure will be in place on Anzac Drive, Wainoni Road and Pages Road.
- A temporary speed limit reduction will apply through the work zone to keep everyone safe.
- Cyclists will be detoured via New Brighton Road, please see onsite signage.
- The bus stop outside the Bexley Garage on Pages Road will be temporarily relocated 200 metres southwest.
- New Brighton Road will be closed between 5 October and 6 November 2026, please see the map below.
Information for residents and neighbours
- Property access will not be affected.
- Sections of the footpath will be closed with a detour in place for pedestrians, please follow the onsite signage.
- There will be construction noise at times, particularly during hydro excavation, and we will do our best to keep this to a minimum.
- Please look out for CORDE staff and follow the signage on site. If you need direction, please approach a staff member who will be able to assist.
We know this work can be disruptive, and we appreciate your co-operation and understanding.
Please advise us via the contact information above if you have any specific property requirements e.g. medical visits, home help, large vehicle deliveries, or any planned works.
Ngā mihi nui, thanks for your patience while we carry out this work.
The work areas are highlighted in orange.