Te Aratai College cycle connection: Aldwins Road and Ensors Road

Update

What

We're building the Te Aratai College cycle connection, a link between two major cycleways – the Rapanui– Shag Rock and the Heathcote Expressway.

Why

Te Aratai College cycle connection will connect two major city cycleways, providing safe cycling connections for Te Aratai College, Eastgate shops and Linwood Park.

Where

Aldwins Road and Ensors Road, north and south bound, from Linwood Avenue to Sullivan Avenue, Phillipstown.

When

29 July to late-November (weather dependent), 7am to 6pm, with some night work at Harrow Street.

Contact

The contractor is Downer NZ. Phone 03 359 0700, Monday to Friday, 8am to 5pm.

Details

Stage 4 – Ensors Road (Ferry Road to Sullivan Avenue)

 

Work moves to Ensors Road, southbound, on the eastern side of the road between Ferry Road and Sullivan Avenue. Crews continue constructing the cycleway and footpath improvements.

 

When
Work on stage four starts on 15th September 2026. Work will take up to four weeks (weather dependent).

 

Work includes

  • installation of separator kerbs
  • new kerb crossings and footpath improvements
  • tactile paving
  • cycle-safe stormwater sump lids
  • new road hump at MacKenzie Avenue
  • mountable kerb islands at Sullivan Avenue
  • road humps, coloured surfacing and line marking.

 

Traffic impacts

  • Road closures: MacKenzie Avenue and Sullivan Avenue, at the Ensors Road intersections, will need to be closed for approximately 10 working days each while works are completed. A road closure notice will be provided 1 week prior advising the preferred detour route. 
  • Southbound traffic will be reduced to one lane through the work area.
  •  A temporary bus stop will be provided while the existing stop is relocated.
  •  Limited on-road parking while work is underway.
  •  Pedestrian and vehicle access with be maintained with directional signage.

Information for residents

  • Access for vehicles, pedestrians and cyclists to impacted properties within our worksite will be maintained.
  • Please advise our team if you have specific requirements e.g. medical visits, large deliveries, home help or any planned works.
  • There’ll be increased construction noise and vibration at times. We’ll do our best to keep this to a minimum.
  • The work will have no impact on any services such as water, electricity, telecommunications and gas.
  • The timing of the work and certain activities will depend on the weather and the roads.
  • Please put your bins out as usual by 6am on collection day.

Find out more at www.ccc.govt.nz/works(external link)(external link) or scan the QR code.