Beach Road - road surface repair

Update

What

We’re resurfacing the road with chipseal to make it safer and more resilient.

Why

Resurfacing adds grip, strength and resilience to our roads. Each year, we resurface more than 100km of the city’s roads, this work is part of that programme.

Where

Beach Road, between Donnington Street and Badger Street, North New Brighton.

When

The work is expected to start on 17 September 2026 and be completed the same day, 7am to 7pm (weather/site condition dependent).

Contact

The contractor is HEB Construction. Phone 0800 432 226 (general enquiries) or 027 467 7832 (Richie Kiwara), Monday to Friday, 8am to 5pm.

Details

Work on your road

We will be resurfacing the road with a chip seal surface. This work will be completed in one day. Please note, the start date may extend by up to 2–3 days, depending on weather and site conditions. We will also be back for two rounds of sweeping, the first scheduled 48 hours after the resurfacing and the second scheduled one week later.

What you need to know

Traffic Impacts

  • The road will be under a Road Closure setup during work hours on the day of the resurfacing. We will try to accommodate vehicle movements to and from your property where possible during the work.
  • Vehicle access to your property may be impacted at times.
  • On-street parking will be impacted, please take notice of the ‘No parking’ signs, which will be put out in advance of the work.
  • Please let the contractor know if you have any specific requirements for property access, i.e. medical visits, home help, large vehicle deliveries, or other planned work on your property.

Please be aware of the following hazards:

  • Movement of construction equipment in and around the site.
  • Emulsion is a hot product and is applied at 80–90 degrees Celsius.
  • We advise staying inside your property during the application process, to keep everyone safe. This includes keeping children and pets indoors when this work is being carried out.
  • Emulsion is an extremely sticky product when first applied. Please check all footwear before entering your property. Emulsion can be removed from shoes etc. by using warm soapy water.

After we’ve finished working:

  • Loose aggregate (small stones) will remain on the road for a few days after the work is done. This is necessary to allow the stones to properly embed into the surface, which helps create a strong, long-lasting road surface. Please take extra care when driving, walking, or cycling.
  • We’ll be back to sweep the site and reinstate line markings within 48 hours of finishing work, but we may be delayed if the weather is cold or wet.
  • You may notice loose aggregate on the road over the next few months, while the surface continues to settle. Our crews will carry out regular checks and arrange for extra surface sweeping if needed.

We know roadworks can be disruptive, and we’re grateful for your cooperation and understanding.

Map of the work area

Stay updated

Learn more about resurfacing and maintenance work on our website ccc.govt.nz/resurfacing(external link).