Water quality and monitoring

A typical analysis of the chemical makeup of Christchurch water, prior to temporary chlorination.

There are 38 routine chemical tests carried out on Christchurch water with 22 of these tests establishing the presence of specific chemicals and to measure they are below acceptable limits.

Chemical Measure 
pH 7.8
pH after aeration 8.2
Acidity to pH 8.3 (as CO3) 1 g/m³
Total alkalinity to pH 4.5 as HCO3 52 g/m³
Turbidity (NTU) Less than 1
Nitrate Nitrogen 1 g/m³
Sulphate 5.0 g/m³
Chloride 5.0 g/m³
Calcium 12.0 g/m³
Fluoride Less than 0.1 g/m³
Magnesium 1.5 g/m³
Potassium 1 g/m³
Sodium 6.1 g/m³
Reactive silica (as SO2) 16.0 g/m³
Total hardness (as CaCO3) 45 g/m³
Conductivity at 20°C (mS/m) 10

Note: Grams per cubic metre (g/m³) is equivalent to milligrams per litre (mg/l).


Related news

Īnanga relocated ahead of in-stream works

Thousands of nationally threatened native freshwater fish and dozens of at-risk lizards have been relocated to allow for restoration work at Halswell’s Greens Stream.

20 Jul 2026

New reservoirs strengthen Akaroa water supply

Akaroa’s water supply has been strengthened with the opening of two new reservoirs at the L’Aube Hill Water Treatment Plant.

17 Jun 2026

Study sheds light on Ōtākaro Avon River catchment flood risks

Flood risks in the lower Ōtākaro Avon River Catchment will increase over time if no action is taken, a Christchurch City Council study shows.

16 Jun 2026

Takiuru ki ā mātou ratonga
Log in to our services